Introduction to EYH Two - Dimensional Mixing and Drying Machine
The EYH two - dimensional mixing and drying machine mainly consists of three major parts: the rotating cylinder, the swinging rack, and the frame. The rotating cylinder is installed on the swinging rack, supported by four rollers, and its axial positioning is carried out by two retaining wheels. Among the four supporting rollers, two driving wheels are dragged by the rotating power system to make the rotating cylinder rotate. The swinging rack is driven by a set of crank - rocker mechanisms. This mechanism is installed on the frame, and the swinging rack is supported on the frame through bearing components.
Its rotating cylinder can perform two movements simultaneously. One is the rotation of the rotating cylinder itself, and the other is the swinging of the rotating cylinder along with the swinging rack. The materials to be mixed are not only rotated, turned over, and mixed inside the rotating cylinder, but also undergo back - and - forth mixing movements from left to right and vice versa as the rotating cylinder swings. Under the combined action of these two movements, the materials can be fully mixed in a short time. It is suitable for mixing all powder and granular materials. Moreover, this equipment has the advantages of rapid mixing, large mixing capacity, and convenient discharging, and is widely used in industries such as pharmaceuticals, chemicals, food, dyes, feeds, fertilizers, and pesticides.
Usage Process of EYH Two - Dimensional Mixing and Drying Machine
1. Preparation before production: Carefully check whether the electrical components are working properly, whether all parts of the machine rotate flexibly, and whether the discharge valve is in a closed state.
2. Loading: Jog the swing button to make the feeding end slightly above the horizontal plane. Then turn off the swing motor button, open the feeding - end cover, and add materials. The feeding amount should be strictly controlled within 50% of the cylinder volume. After feeding, be sure to tightly cover and fasten the cover.
3. Mixing: Turn on the swing motor and at the same time turn on the rotation motor to start the mixing operation. The mixing time is usually controlled within 10 - 15 minutes, and a timer can be used to set the time for accurate control.
4. Discharging: Jog the swing button to make the discharge valve at the lowest position, stop swinging, place the hopper, open the butterfly valve, and turn on the discharge button for discharging. After discharging, promptly close the discharge butterfly valve.
5. Cleaning (when changing products): Close the discharge butterfly valve, jog the swing button to make the feeding end at a lower position, open the feeding cover, tighten the water - discharge port screw cap, add tap water accounting for 10 - 20% of the cylinder volume, cover and fasten it tightly. Turn on the swing motor and the rotation motor, and stop the machine after 10 - 15 minutes of cleaning. Jog the swing motor to make the feeding end at a lower position, jog the rotation button to make the water - discharge port of the feeding end above the horizontal plane, remove the screw cap, connect the water - discharge pipe, place the water bucket, jog the rotation button to make the water - discharge port at the lowest position for water discharge. After the water is discharged, use a clean mop to dry the remaining water adhering to the inner wall of the cylinder. After natural air - drying for 6 - 8 hours, screw on the water - discharge port screw cap, and then production can be carried out again.
After - sales Service and Other Services
1. After - sales service: Changzhou Erbang Drying Equipment Co., Ltd. provides all - round after - sales services for customers. During the warranty period of the equipment, if there are failures caused by non - human reasons, the company will repair or replace parts free of charge. After the warranty period, long - term technical support and supply of spare parts are still provided, and only reasonable cost fees are charged. The company has a professional after - sales team. After receiving the customer's failure feedback, it will respond quickly and solve the problem for the customer as soon as possible.
2. Other services: Provide personalized equipment customization services according to the special needs of customers; Provide equipment operation training for customers to ensure that customer staff can operate the equipment skillfully and safely; Provide equipment installation and commissioning services to ensure that the equipment can be smoothly put into use at the customer's site; Regularly visit customers, understand the equipment usage situation, collect customer opinions and suggestions, and continuously improve product and service quality.