XCMG 25Ton QY25K5 truck crane for construction: The all-round partner for small and medium-sized engineering lifting
In small and medium-sized construction projects such as municipal road paving and factory building construction, the industry's pain points are quite prominent - older models of cranes either have insufficient working radius, making it impossible to lift components at a greater distance; or the relocation process is troublesome, requiring a full day to dismantle the arm and load onto the vehicle, and multiple operations need to be carried out in sequence to keep up with the schedule. Your problem is more specific - when this lifting equipment is combined with Concrete Pump Truck, Concrete Mixer Truck, and Dump Truck, it often fails to keep up with the material transportation and pouring rhythm, causing subsequent equipment to wait for work and slowing down the overall project schedule. To address these issues, XCMG 25Ton QY25K5 truck crane provides targeted solutions. With a rated lifting capacity of 25 tons and a main boom of 33.5 meters, it can lift reinforcing bars and prefabricated beams with ease, smoothly connecting with Dump Truck for sand and gravel transportation, Concrete Mixer Truck for concrete delivery, and then cooperating with Concrete Pump Truck for pouring. In actual project applications, the lifting efficiency of a single project can be increased by 25%, and the idle waiting time for the equipment is significantly reduced.
Product features
It adopts a fully hydraulic telescopic boom structure, with an arm extension and retraction speed 15% faster than traditional models, and the positioning is precise. Even in narrow areas with narrow building spacings and numerous obstacles, it can complete the lifting task stably. Whether it is the pipe erection during road paving or the steel frame installation in factory construction, it is applicable;
It is equipped with an intelligent lifting control system, which can display the load weight and boom elevation angle in real time during operation. Once it approaches the safety limit, it will issue a warning. This not only reduces the risk of overloading and improper operation but also reduces downtime and rework caused by operational errors, ensuring the progress of the project schedule.
Tips
Before each operation, in addition to checking tire pressure and leg status, it is essential to pay special attention to the oil level in the hydraulic oil tank and observe whether there is any leakage at the hydraulic pipeline interface. If the oil is insufficient or there is leakage, it should be replenished and repaired in time to avoid arm extension and retraction stalling during operation;
Before collaborating with Concrete Pump Truck, Concrete Mixer Truck, and other equipment, it is recommended to communicate the operation process with the equipment operators in advance. Usually, the high-level components such as beams and slabs are lifted first, and then the Concrete Pump Truck enters the site for pouring, leaving enough working space for subsequent equipment, avoiding delays caused by cross-operation.