Laster cutting
4 month ago
- CG125 complete motorcycle wiring harness kit 12V builds covering the region's largest service population
- Kit scope including switches, connectors and terminals so workshops need no additional parts
- 100% electrical testing per unit, keeping return rates at PPM level
- MOQ from 100 kits per SKU, consolidated mixed-SKU shipments for distributors
- Samples in 5 to 7 days, mass production in 15 to 25 days
Precision Specifications for Aftermarket Distribution
- Fitment verification: every harness is checked against the target model's connector layout before production release. The CG125 programme alone covers multiple connector revisions across different model years, and we specify which revision each kit matches rather than shipping a generic build.
- Switch quality: handlebar switches are the most common reason a kit is returned as defective. Our kits include switches rated for the original duty cycle, tested for contact resistance and mechanical action before assembly.
- Terminal retention: terminals are crimped on automated presses with pull-force verification per batch, because loose terminals cause intermittent faults that generate returns attributed to the harness.
- Color coding: wire colors match original equipment conventions where documented, reducing installation time in workshops that work across multiple brands.
- Documentation: each SKU carries an installation reference noting connector positions and model-year variations, which workshops treat as part of the product.
Application Scenarios for Latin American Buyers

Testing and Quality Control Process
Customer Case: From 6.2% Returns to 0.9% Across Three Brands
- Harness kit return rate: 6.2% down to 0.9% over 12 months
- Average installation time per kit: 95 minutes down to 40 minutes
- Workshop reorder frequency: quarterly to monthly on improved sell-through
- Quarterly supplier audit score: 74 up to 92
- Kit specifications moved to exact-fit builds with connector revisions documented per model year, eliminating the mismatch returns.
- Kit scope expanded to include switches and terminals, so workshops stopped sourcing additional parts that introduced their own failure points.
- The CG125 complete motorcycle wiring harness kit 12V programme launched as the anchor SKU, covering the largest service population with one consolidated order.
- Transition ran on parallel supply for two months: both vendors shipped simultaneously until three consecutive lots passed their audit threshold. No stock-out occurred during changeover.
Why Choose Us
- 30+ years of OEM/ODM manufacturing depth, certified to ISO 9001:2015 and ISO 14001:2015, with ISO 13485 discipline carried over from our medical cable programmes. Production capacity of 30,000 to 50,000 pieces per month supports consolidated multi-market programmes without queue delays.
- An in-house verification lab rather than outsourced testing: laser wire strippers, color line-sequence detectors, cable bending testers, two-dimension measuring instruments and heat chambers. We show Latin American buyers the equipment behind each specification, on video or in person at our Dongguan facility.
Customisation Services
- OEM/ODM engineering starts from your drawing, an original sample, or a model-year specification. Connector equivalents are confirmed with datasheets before quoting, and multi-brand programmes are quoted as one consolidated scope. Design revisions during sampling cost nothing extra as long as tooling is unchanged.
- Flexible volume from 100-kit MOQ per SKU to 50,000 pieces per month, with mixed-SKU consolidation for distributors stocking multiple models. Programmes including electronic modules can add turnkey support from our PCB assemblies team without a second supplier.
After-Sales Service
- Every shipment carries a document pack with CoC, test reports and material declarations. If any kit fails within warranty, we arrange replacement after joint failure analysis, typically resolved within 15 working days. Failed units get root-cause reports, not just swaps, so return data improves your next order.
- A dedicated account engineer follows each Latin American programme from sample to volume, with 24-hour response on technical questions and Spanish-language documentation for workshop-facing materials on request.
Packaging, Shipping and Trade Terms
- Standard packing: each kit in a PE bag with SKU and fitment label, then export cartons. Retail-ready packaging with Spanish fitment information available for distributor brands.
- Shipping: samples via DHL, FedEx or UPS door-to-door; mass production by sea freight to Manzanillo, Lazaro Cardenas, Veracruz or other regional ports.
- Trade terms: FOB HK standard, CIF quotes for Mexico and broader Latin American ports on request. Payment typically 30% deposit by T/T in USD, balance before shipment.
- Lead time: samples 5 to 7 days, mass production 15 to 25 days, mixed-SKU shipments coordinated to your stock cycle.
How to Order

FAQ
Get Started
- Request a trial kit — send your target model list or sample harness, samples ship in 5 to 7 days.
- Get a quotation in 24 hours — email your SKU list and receive pricing with fitment confirmation.
- Book a live factory video audit — walk through our testing lab and lines with your team before you commit.
Similar Video Recommendation
If you are interested in the product, contact Bossgoovideo.com for more information
- *To:
- DONGGUAN CHAMAX TECHNOLOGIES CO., LTD.
- *Message:
-
Submit
Main Product:
Consumer And Communication Cable Assembly,
Medical And Industrial Cable Assembly,
Wire Harness,
PCB Assembly ,
Injection parts,
3C Finished Goods